Frontiers Quantifying the Underlying Causes of a Discrepancy Between Predicted and Measured Energy Use
For Office 17, significant parameters are the lighting and equipment power densities, typical for office buildings that are naturally ventilated. Although, some of these parameters have a strong correlation with individual end-uses, their effect on total energy is negligible, as presented on the right side of the diagram. This was primarily helpful to capture the uncertainty of the Variable Refrigerant Flow (VRF) control strategy. The inputs and outputs were used to understand the sensitivity of the input parameters on the outputs. By varying the input parameters within the model, their individual impact on different end-uses can be analyzed. Then, the time series is again scaled to between 0 and 1, and a typical weekday and weekend day were calculated, as shown in Figure 7.
The assumptions used in the calculations for estimating the operating hours of lighting after the retrofit were 2,100 (h/annum) for both Urban 2 and Urban 3. Inputting the measured lights on hours into the original calculation for the after scenario, this project has saved more annual electricity and annual CO2e emissions than originally predicted. The predicted annual CO2e and electricity consumption are compared with the measured values using the before and after process in Table 2 and is shown in Figure 8. Operational hours are used as a proxy for occupancy hours which is in turn used as a proxy for lights on hours which supports the previous building’s analysis. The predicted 8,222 annual operating hours were calculated from survey data where prior to the retrofit some of the corridor lights did not have switches and remained on constantly, some were on for up to 80% of the year.
Comparing typical weekday and weekend day for predicted and measured energy use proved to be helpful in determining typical hourly differences and identified if adjustments were necessary. An overview is given of typical adjustments among the case study buildings, and more specific adjustments to adjust outliers. For each building model, manual adjustments were made to bring the predicted energy use closer to measured energy use (i.e., manual calibration). Although both highlight strong effects on their respective energy end-uses, their proportionate effect on total energy use is considerably smaller.
The corridor lighting upgraded was completed in 2014 with microwave sensors, the corridors on the first floor where this study was located have a mixed use of academic offices and centrally bookable classrooms. Equation 1 is extracted from the external consultants calculations used in these corridor lighting upgrade projects and they are based on the Carbon Trust formulae for calculating the business cases for retrofit projects (Carbon Trust, 2012). Two buildings Urban and Maths had upgrades completed by 2013, the financial payback periods for the Humanities lighting upgrade was considered unviable and therefore the decision was made that this building’s corridor lighting would not be upgraded at the time. This will allow for evaluation of the accuracy of the energy efficiency calculations commonly used by energy managers for decision making.
Typical weekday and weekend day profiles of energy use were used to compare predicted and measured energy use and understand the hourly variation in energy use, profiles were created for a per year basis. BuroHappold Engineering had no role in study design, data collection, data analysis, decision to publish or preparation of the manuscript. DM is CvD’s first academic supervisor during his doctoral studies and has reviewed the paper and provided feedback for initial revision. CvD, the main author, is a doctoral researcher and is the main contributor to this original research paper. In practice, however, this occurs as increasingly stringent building efficiency targets set by the government or local councils are not being met.
For example, boiler efficiency is weakly correlated to total energy use, because of the small percentage of gas use out of total energy use, used solely for radiator heating within circulation spaces. For each model, parametric simulations created an input- and output space (i.e., samples of input parameters and predictions of energy use). Uncertainty analysis quantifies uncertainty in the output of the model due to the uncertainty in the input parameters. Differences between predicted and measured energy use were compared on a detailed level to identify performance issues. It is the process of changing input parameters in order to obtain a model that lies within agreed boundary criteria and is therefore likely to predict future options more closely related to the actual situation. Whereas, the static performance gap is not well-understood, because performance modeling has not been common practice among practitioners, and where it is undertaken, predictions are often not validated.
The data collected include in-depth 1 min resolution of corridor lighting on time, corridor occupancy, vertical corridor illuminance, and building level electricity metering where available. The key contribution of this work is to measure the performance gap in corridor lighting by taking a retrospective approach and analysing three buildings lighting use by recording actual occupancy and lights on data. There are no indications within the calculations as to why these differences are so large—as previous researchers have pointed out, these assumptions survive unchallenged (Menezes et al., 2012).
The occupancy in the three corridor data collection areas is shown alongside the predicted value of operational hours in Figure 5, from the three areas a median value of 831 per annum, and SD of 354 (h/annum) are calculated. The predicted annual CO2e emissions and electricity consumption are compared read the source with the measured values using the before and after process in Table 2 and is shown in Figure 4. Operational hours are used as a proxy for occupancy hours which is in turn used as a proxy for lights on hours. The heuristics, or rules of thumb, used in the assumptions could be perceived as overoptimistic in their major underestimation of the actual patterns of lights on hours which are 138% higher than predicted operational hours. The energy efficiency predictions for electricity consumption and reduction in CO2 equivalent emissions for the three buildings are detailed in Table 2. The designs and calculations used in these projects were carried out in 2012 and 2013, since then the LENI calculation has been further refined, for differentiating daytime, night time, and parasitic consumption, nonetheless the original calculation is used for comparison purposes.
It is also increasingly used in activities such as commissioning and energy retrofitting scenarios of existing buildings (Fabrizio and Monetti, 2015), as an accurately calibrated model is more reliable in assessing the impact of Energy Conservation Measures (ECMs). Trend analysis, energy audits, and traditional commissioning of systems can highlight poor performing processes in a building. The use, distribution or reproduction in other forums is permitted, provided the original author(s) or licensor are credited and that the original publication in this journal is cited, in accordance with accepted academic practice. Performance gap, lighting, corridors, higher education, decision making, carbon emissions, electricity consumption This can be achieved through following stages 3–5 in the “Lighting Design Process” Figure 1 with regular re-commissioning and dramatically shortening the time delay to switch off. It is proposed that the closer the lights on hours are to the occupancy hours in these buildings, the greater the savings in annual electricity consumption and carbon dioxide emissions.